SpaceX · posted · checked
Lead Supplier Development Engineer (SpaceXSI)
On-site · BastropStaff+
SpaceX posted this as a on-site role in Bastrop, 5 days ago. No salary is stated. See all 800 open SpaceX jobs.
Hiring signals: Open 5 days · 293 new roles at SpaceX in 30 days
SpaceX was founded under the belief that a future where humanity is out exploring the stars is fundamentally more exciting than one where we are not. Today SpaceX is actively developing the technologies to make this possible, with the ultimate goal of enabling human life on Mars.
LEAD SUPPLIER DEVELOPMENT ENGINEER (SPACEXSI)
SpaceX is seeking a Lead Supplier Development Engineer for the Superintelligence program. You will lead supplier development for one commodity on the supercomputer and data center build: infrastructure (switchgear, busway, power distribution, and rack power), cable and harness, or cooling. You will decide which suppliers are fit to ship, which processes are ready for rate, and how nonconformances get closed.
RESPONSIBILITIES:
Build and lead the supplier development engineers for the assigned commodity on SpaceXSI supercomputer and data center hardware
Set one standard for supplier qualification, first article, production part approval, process control, and corrective action, and hold the team to it
Work with supply chain, design, reliability, operations, and production so the policy on your commodity is the same from the supplier floor to the site
Own supplier qualification. Audit the process, the quality system, and the capacity before a supplier is released to ship
Implement the production part approval process for hardware qualification and approve the pack only when the objective evidence is there
Read supplier quality and delivery data, find the systemic gap, and put an engineer on the improvement until it is verified
Run material review, root cause, and 8D with receiving, supplier quality, and the supplier. Contain suspect material in the warehouse and in the hall
Know how the purchased part goes into the next assembly. Give design for manufacturing feedback while the drawing can still change
Find the bottleneck, the yield loss, and the rate limiter in the supplier process and remove them
Set the schedule to bring up a new part or a design change, and track the supplier against that schedule