Last Energy · posted · checked
Lead Systems Engineer
On-site · AustinStaff+
Last Energy posted this as a on-site role in Austin, 1308 days ago. No salary is stated. See all 9 open Last Energy jobs.
Hiring signals: Open 1308 days · 1 new role at Last Energy in 30 days
Open a long time or reposted: it may be an always-open role. Apply, but don't wait on it.
Last Energy is a pioneering US technology company focused on fleet-wide deployment and operation of next-generation nuclear assets. We are revolutionizing nuclear power delivery for rapid deployment and scalability.
We are seeking a Lead Systems Engineer at our office in Austin, TX. This person owns the system architecture, requirements, and verification trail for our PWR-5 pilot reactor at the Texas A&M RELLIS campus, part of the U.S. Department of Energy Reactor Pilot Program. The work covers three areas: architecting how the system fits together, owning and decomposing its requirements, and proving through verification and validation that the design works. This is a hands-on role. You author the documents yourself and pull in subject matter experts where you need depth.
The next phase of product development takes the pilot reactor to full operating pressure and temperature. This role joins at the start of this new era and stays with it through build. Most of the work happens in Austin, and travel to RELLIS increases to once or twice a week late as things progress.
The Lead Systems Engineer works across the engineering organization, with no direct reports. This role shapes how Last Energy does systems engineering. It turns the PWR-5 into a documented, traceable system and builds the process every future unit will follow. This person sets technical direction, defines interfaces, and brings clear recommendations to engineering leadership, who make the final call on major design decisions.
Key Duties & Responsibilities
Architect the PWR-5 system end to end, from sensors to control logic to mechanical and electrical systems, and define how each part interfaces with the others.
Own system requirements and design trade-offs for phase two, starting with requirements capture and decomposition.
Author system description documents, requirements documents, interface control documents and diagrams, and requirements traceability matrices.
Plan and track verification and validation, from bench test to integrated test to validation against customer requirements.
Integrate hardware and software components into one working system, including the phase two move from point-to-point analog controls to programmable logic controllers (PLCs). Partner with the instrumentation and controls (I&C) team, which owns sensors, control logic, and PLC programming.
Baseline the system design and show the downstream impact of every proposed change, so leadership can decide quickly with full information.