3. Baseline Development & Functional Alignment
▪Lead development of L1/L2/L3 integrated schedules in Primavera P6 (TTS, OTS, MTS, STS, and portfolio-level schedules) in line with global planning standards.
▪Integrate Supply Chain inputs (supplier lead times, manufacturing cycles, PO required dates, logistics) and keep them synchronized for Engineering requirements across multi-unit projects.
▪Model Concurrent Engineering workflows with Engineering leads to compress schedules without increasing risk.
▪Lead Commitment Meetings with functional owners (Engineering, Sourcing, PM) to resolve disconnects and secure buy-in for the project baseline.
4. Schedule Control, Performance Monitoring & Recovery
▪Own baseline integrity: manage rebaselining (e.g., 00 to P0), change logs, and preservation of commitment dates.
▪Perform critical and near-critical path analysis, float consumption and "Say/Do" analysis, and risk-based planning, then proactively recommend mitigation and recovery actions.
▪Run "what-if" scenarios and micro-planning for critical or delayed work packages to support recovery planning.
▪Lead delay analysis (TIA, as-planned vs. as-built) to support EOT and cost claims, and evaluate the schedule impact of customer scope changes.
▪Maintain risk and opportunity inputs within the schedule and assess their impact on the critical path.
5. Business Problem Solving & Analytics
▪Identify systemic drivers of schedule slippage and OTD gaps across projects. Develop data-driven solutions and drive them to closure with functional leadership.
▪Develop and maintain S-Curves, Earned Value progress measurement, forecasts, KPIs, and OTD/LD milestone reporting.
▪Ensure Primavera P6 remains the single source of truth, and govern data quality across integrated tools (PLM, UDC, Unifier, Pulse, Tableau).
6. Reporting & Stakeholder Management
▪Prepare and present dashboards, progress reports, and management presentations to steering committees, senior leadership, and customers.
▪Translate complex schedule data into clear, actionable insights for non-planning audiences.
▪Challenge unrealistic durations and commitments, and influence outcomes across functions without direct authority.
7. Continuous Improvement & Governance
▪Define, own, and continuously improve planning standards, templates, and data management practices in partnership with the Scheduling COE.
▪Drive process harmonization across regions and functions.
▪Lead project close-outs, capture lessons learned, and institutionalize best practices across Gas Power Engineering.
▪Build planning capability through training, knowledge sharing, and succession development.
8. Standard Schedule Templates
▪Own and maintain the library of standard schedule templates (e.g., TTS, OTS, MTS, STS) for Gas Power Engineering scopes.
▪Capture lessons learned from ongoing projects (not only at close-out) and feed them into the standard templates, covering activity logic, durations, sequencing, and risk buffers.
▪Recommend and drive continuous improvements to the templates, based on schedule performance, delay trends, and feedback from planners and functional leads.
▪Maintain template quality so that schedule preparation timelines are reduced. Templates should need minimal rework, be consistent across projects, and be aligned with global planning standards.
▪Define template governance: versioning, change approval, and release communication. Coach planners on correct template use and tailoring.
9. Continuous Improvement & Governance
▪Define, own, and continuously improve planning standards and data management practices in partnership with the PCPS COE.
▪Lead and drive Continuous Improvement (CI) initiatives related to Planning & Scheduling, from identifying improvement opportunities through implementation, sustainment, and measurable results.
▪Represent Engineering Planning & Scheduling in Kaizen events, Gemba walks and sessions, workshops, strategic workouts, and other cross-functional improvement forums.
▪Bring the planning perspective to these forums, such as schedule performance data, delay drivers, and process pain points. Shape actions that improve OTD and reduce planning effort.
▪Translate outcomes from these sessions into actionable plans for the planning team, with clear owners, timelines, and follow-through.
▪Drive process standardization & harmonization across regions, Product lines and functions in Engg. Planning & scheduling.
▪Lead project close-outs, capture lessons learned, and institutionalize best practices across Gas Power Engineering Planning & Scheduling.
▪Build planning capability through training, knowledge sharing, and succession development.
Required Qualifications
▪Bachelor's degree in Mechanical, Electrical, or Civil Engineering (or Construction Management, Supply Chain, or a related field).
▪12+ years of experience in Engineering Planning, Project Planning, or Equipment Planning within complex industrial or EPC environments (Power Generation, Oil & Gas, or Heavy Industrial preferred), including experience leading planning across multiple projects.
▪Expert-level Primavera P6 skills, with the ability to build, audit, and govern large, complex schedules (10,000+ activities).
▪Deep expertise in CPM, float management, baseline governance, Earned Value, and delay/claims analysis.
▪Proven experience integrating supply chain and concurrent engineering into project schedules.
▪Working knowledge of PLM/PALM and UDC, including how engineering progress and deliverable data integrate with Primavera P6 for schedule updates and reporting.
Desired Characteristics
▪Demonstrated leadership in setting planning strategy, mentoring teams, and driving cross-functional alignment.
▪Proven track record of solving complex, business-level delivery problems and improving OTD.
▪Strong analytical, communication, and executive-presentation skills. Confident influencing senior leaders and customers.
▪Assertive, self-driven, and able to drive action without direct authority.
▪PMP or PSP (AACE) certification is highly desirable.
▪Experience supporting proposal, contract, and execution phases on large-scale power or industrial projects.
▪Demonstrated behaviors aligned with The Vernova Way.
▪Experience leading or actively participating in CI initiatives (Kaizen, Gemba, Lean, or similar), with a track record of delivering measurable process improvements.
Additional Information
Relocation Assistance Provided: Yes