ATOMS Careers page · posted · checked
Technical Program Manager – Hardware & Manufacturing
$122k – $151kOn-site · San Francisco
ATOMS Careers page posted this as a on-site role in San Francisco, 51 days ago. Pay: $122k – $151k. See all 109 open ATOMS Careers page jobs.
Hiring signals: Open 51 days · 21 new roles at ATOMS Careers page in 30 days
Open a long time or reposted: it may be an always-open role. Apply, but don't wait on it.
Who we are
Pronto AI is a global leader in commercializing autonomous vehicle (AV) technology, deploying Autonomous Haulage Systems (AHS) that automate operations in mines, quarries, and construction sites worldwide. While much of the industry remains in R&D, we deliver real, production-ready autonomy that is already operating in the field.
We are on a mission to make mining operations safer, smarter, and more efficient through cutting-edge technology, and we are building toward becoming the world’s first profitable AV technology company.
About the role
The Hardware & Manufacturing TPM owns the queue where onsite hardware and QC issues meet engineering — the seam between the build floor (OEM production lines, upfit partners, kitting) and the teams that own the design. This role triages incoming hardware issues across active builds, on-road transport truck kitting and off-road mining kit installs alike, decides what escalates and to whom, and owns inventory issues before they hold up a build.
Today those reports land in a shared channel with no consistent triage, so a cosmetic issue and a line-stopping one compete for attention in whatever order they arrive. This role replaces that with a single owned queue.
What you’ll do
Intake & Triage
Own a single intake queue for hardware and QC issues reported from build lines and field sites, replacing today's mix of ad hoc Slack messages and DMs.
Triage every incoming issue by severity and impact — distinguishing a line-stopping defect from a cosmetic one — rather than working items in the order they arrive.
Set and hold response-time expectations for build partners and plant contacts.
Dev-Queue Prioritization
Prioritize the engineering dev queue against what's actually blocking a build or a site, not against whichever issue was reported most recently.
Identify when several individual tickets are the same underlying defect, and roll them into one engineering fix rather than let them get worked separately.